用户名/邮箱
登录密码
验证码
看不清?换一张
您好,欢迎访问! [ 登录 | 注册 ]
您的位置:首页 - 最新资讯
Yinson gets two letters of intent from Petrobas valued RM21.7b over 22.5 years
2021-11-15 00:00:00.0     星报-商业     原网页

       

       KUALA LUMPUR: Yinson Holdings Bhd has been awarded two letters of intent by Petróleo Brasileiro S.A. (Petrobras) for a floating, production, storage and offloading (FPSO) vessel in the North Campos Basin, offshore Brazil.

       It said on Monday, the LOIs were for the charter, operations and maintenance of Integrado Parque das Baleias (IPB FPSO).

       “The estimated aggregate value of the contracts is equivalent to US$5.2bil (RM21.7bil). The contract period is for 22.5 years from the date of the final acceptance,” it said.

       The LOIs were issued to Yinson Production Pte Ltd, an indirect unit of Yinson. Following the LOIs, Yinson Bergenia Production B.V, will enter into a charter contract for the provision of the FPSO.

       Meanwhile, Yinson Bergenia Servi?os de Opera??o Ltda will enter into a contract for the asset’s operations and maintenance.

       The estimated aggregate value of the contracts is equivalent to US$5.2bil (RM21.7bil). The contract period is for 22.5 years from the date of the final acceptance.

       IPB FPSO will be Yinson’s second vessel to operate in Brazil waters, with the first being FPSO Anna Nery, which was awarded to Yinson by Petrobras in October 2019. FPSO Anna Nery is currently under construction in Cosco Changxing, China, and is on track to be operational in 2023 in the Marlim field, located in Northeastern part of the Campos Basin.

       Yinson group CEO Lim Chern Yuan said that the group is well-positioned to take on the IPB FPSO project, as it had successfully strengthened its resources, capacity and expertise in Brazil over the past few years. “Brazil is a region of paramount importance to Yinson and we are committed to giving our very best in order to contribute to the advancement of the country’s energy industry.

       “We are pleased that the efforts we have put into building our presence in Brazil have created synergies that will allow our Brazil-based projects to achieve greater efficiencies, creating greater value for all our stakeholders,” Lim said.

       Yinson Production Offshore CEO Flemming Gr?nnegaard said, “The team has gained valuable skills and experience through our existing activities in Brazil and has also thus far been able to adapt and innovate to overcome the many challenges brought about by the pandemic and uncertain global economic situation.

       “With this experience, we are stronger than ever and ready to demonstrate once again that we can successfully deliver a world-classed FPSO project.”

       


标签:综合
关键词: Petrobras     offshore Brazil     Production     contract     Yinson Holdings     Bergenia    
滚动新闻