用户名/邮箱
登录密码
验证码
看不清?换一张
您好,欢迎访问! [ 登录 | 注册 ]
您的位置:首页 - 最新资讯
HSS Engineers appointed lead consultant for Sultan Abdul Aziz Shah airport master layout plan
2023-09-10 00:00:00.0     星报-商业     原网页

       

       KUALA LUMPUR: HSS Engineers Bhd's associate HSS Integrated Sdn Bhd has accepted the appointment by Malaysia Airports Sdn Bhd to be the lead consultant (civil and structural engineer) for the submission of the amendment to the master layout plan of Sultan Abdul Aziz Shah airport as well as subsequent infrastructure and associated works (Phase 2 and 3).

       In a filing with Bursa Malaysia, HSS Engineers said the contract, valued at RM68.52mil or 7.1% of the total cost works for the project, will run for a period of five years commencing Aug 29, 2023.

       Before the break, the trading stock of HSS Engineers was down one sen or 1.61% to 61 sen a share on the back of 273,700 units exchanging hands.

       


标签:综合
关键词: 52mil     Bursa Malaysia     Integrated Sdn Bhd     HSS Engineers     273,700    
滚动新闻