用户名/邮箱
登录密码
验证码
看不清?换一张
您好,欢迎访问! [ 登录 | 注册 ]
您的位置:首页 - 最新资讯
HSR: To build or not to build?
2024-01-20 00:00:00.0     星报-商业     原网页

       

       THE idea to build a bullet train line connecting Kuala Lumpur and Singapore has been around since the late 1990s, but it has been shelved every single time due to high costs.

       When YTL Group unsuccessfully tried to revive the high-speed rail (HSR) project in 2006, the cost was estimated at RM8bil for 325km or about RM24mil per km.

       


标签:综合
关键词: YTL Group     high-speed     Kuala     revive     bullet     RM24mil     Lumpur     RM8bil     325km     shelved    
滚动新闻