用户名/邮箱
登录密码
验证码
看不清?换一张
您好,欢迎访问! [ 登录 | 注册 ]
您的位置:首页 - 最新资讯
Construction of MRT station in Pasir Ris paused after noise barrier panels wrecked
2024-01-19 00:00:00.0     海峡时报-新加坡     原网页

       

       SINGAPORE – The Land Transport Authority (LTA) has called for a safety timeout at the construction site of an MRT station in Pasir Ris, after a section of the noise barrier panels came crashing down upon being hit by machinery.

       In response to queries from The Straits Times, spokesmen for the Ministry of Manpower (MOM) and the LTA said the incident took place on Jan 16 around 5pm, at the site of the upcoming Pasir Ris East station.

       While performing excavation works, a grab bucket that was attached to a machine tilted and fell onto the barriers along the perimeter of the worksite, causing part of the barriers to collapse, said the MOM spokesman.

       A grab bucket is a tool that has jaws, designed to scoop up materials such as soil, sand or coal.

       The spokesman added that the occupier of the worksite is Sinohydro (Singapore Branch), while the developer is the LTA.

       The LTA spokesman said the broken panels were removed from the worksite, and a professional engineer has verified that the remaining structure is safe.

       A safety timeout is a planned event where companies take time off from their daily work routine to take stock of and review workplace safety and health systems, and work processes.

       Get a round-up of the top stories to start your day

       Thank you!

       Sign up

       By signing up, you agree to our Privacy Policy and T&Cs.

       In a Facebook post on Jan 18, Shin Min Daily News reported that the barriers are about four storeys high and erected just a few metres away from Block 208 Pasir Ris Street 21.

       There were no injuries to workers or damage done to the nearby Housing Board block as a result of the accident, said the LTA spokesman.

       A noise balloon has been put up at the site to temporarily reduce noise pollution while the barrier is being repaired, he added.

       “LTA takes a serious view of safety incidents,” said the spokesman.

       “We called a safety timeout to check that the site is in order before allowing (the) contractor to continue work.”

       MOM is investigating the incident.

       As part of the Cross Island Line, construction of Pasir Ris East station, as well as 11 other stations, is expected to be completed by 2030.

       More On This Topic

       Dislodged hose from construction site sprays mud on car, Marymount Road; no one hurt

       Full reopening of Ulu Pandan Park Connector to be delayed by about 6 months to mid-2024

       Unlock unlimited access to ST exclusive content, insights and analyses

       ST One Digital - Annual

       $9.90 $4.95 /month

       Get offer

       $59.40 for the first year and $118.80 per year thereafter.

       ST One Digital - Monthly

       29.90 $9.90 /month

       Subscribe today

       No lock-in contract

       Unlock more knowledge, unlock more benefits

       New feature: Stay up to date on important topics and follow your favourite writers with myST All subscriber-only content on ST app and straitstimes.com Easy access any time via ST app on one mobile device

       Join ST's WhatsApp Channel and get the latest news and must-reads.

       Cross Island Line LTA Accidents - workplace Pasir Ris

       Facebook Telegram More Whatsapp Linkedin Twitter FB Messenger Email Print Purchase Article Copy permalink https://str.sg/Gcqh

       Read this subscriber-only article for free!

       Just sign up for a free account and log in to continue reading.

       Construction of MRT station in Pasir Ris paused after noise barrier panels wrecked

       Sign up

       Already have an account? Log in.

       All done! This article is now fully available for you

       Construction of MRT station in Pasir Ris paused after noise barrier panels wrecked

       Read now

       Please verify your e-mail to read this subscriber-only article in full

       Construction of MRT station in Pasir Ris paused after noise barrier panels wrecked

       Resend verification e-mail

       The gift link for this subscriber-only article has expired.

       Get unlimited access to all stories at $0.99/month for the first 3 months.

       Subscribe now

       You have reached your limit of subscriber-only articles this month.

       Get unlimited access to all stories at $0.99/month for the first 3 months.

       Subscribe now

       Read and win!

       Read 3 articles and stand to win rewards

       Let's go! Terms & conditions apply

       Frequently asked questions

       Good job, you've read 3 articles today!

       Spin the wheel now

       Let's go! Terms & conditions apply

       Frequently asked questions

       


标签:综合
关键词: Construction     spokesman     Pasir Ris     noise     worksite     barrier panels     article    
滚动新闻