{"uid":"3","hostPeerName":"https://www.business-standard.com","initialGeometry":"{\"windowCoords_t\":10,\"windowCoords_r\":955,\"windowCoords_b\":1030,\"windowCoords_l\":10,\"frameCoords_t\":1091.953125,\"frameCoords_r\":456,\"frameCoords_b\":1341.953125,\"frameCoords_l\":456,\"styleZIndex\":\"auto\",\"allowedExpansion_t\":0,\"allowedExpansion_r\":0,\"allowedExpansion_b\":0,\"allowedExpansion_l\":0,\"xInView\":0,\"yInView\":0}","permissions":"{\"expandByOverlay\":false,\"expandByPush\":false,\"readCookie\":false,\"writeCookie\":false}","metadata":"{\"shared\":{\"sf_ver\":\"1-0-40\",\"ck_on\":1,\"flash_ver\":\"0\"}}","reportCreativeGeometry":false,"isDifferentSourceWindow":false,"goog_safeframe_hlt":{}}" scrolling="no" marginwidth="0" marginheight="0" width="300" height="250" data-is-safeframe="true" sandbox="allow-forms allow-popups allow-popups-to-escape-sandbox allow-same-origin allow-scripts allow-top-navigation-by-user-activation" role="region" aria-label="Advertisement" tabindex="0" data-google-container-id="3" style="border: 0px; vertical-align: bottom;">
Union Minister for Power and New and Renewable Energy R K Singh on Thursday said that power transmission planning should take green hydrogen production and offshore wind generation into account. The minister was reviewing the implementation of the inter-state electricity transmission system (ISTS) in the country at a meeting in Jaipur.
The minister said the transmission plan should be dynamic and sensitive to changing needs of the sector. He also told officials that transmission infrastructure should be developed ahead of generation so that there are no constraints in evacuating power.
The minister told officials that by 2030, the country’s installed power capacity is likely to grow to over 777 GW and the peak demand is slated to reach 335 GW. Developing transmission infrastructure is crucial to generate electricity from non-fossil sources, the minister added.
The Centre plans to achieve its target of having 50 per cent of installed electricity generation capacity from non-fossil sources by the year 2030. In December 2022, the Central Electricity Authority (CEA) worked out the cost of setting up a new ISTS for integration of the planned 278 GW of renewable energy capacity, part of the larger national target of 500 GW RE capacity by 2030, at Rs 2.44 trillion.
Alaska
Cruises
$196
Shop now
Pacific
Coastal…
$89
Shop now
Europe
Cruises
$3,999
Shop now
Cruise Critic Official Site
Cruise Critic
{"uid":"5","hostPeerName":"https://www.business-standard.com","initialGeometry":"{\"windowCoords_t\":10,\"windowCoords_r\":955,\"windowCoords_b\":1030,\"windowCoords_l\":10,\"frameCoords_t\":2317.953125,\"frameCoords_r\":456,\"frameCoords_b\":2567.953125,\"frameCoords_l\":456,\"styleZIndex\":\"auto\",\"allowedExpansion_t\":0,\"allowedExpansion_r\":0,\"allowedExpansion_b\":0,\"allowedExpansion_l\":0,\"xInView\":0,\"yInView\":0}","permissions":"{\"expandByOverlay\":false,\"expandByPush\":false,\"readCookie\":false,\"writeCookie\":false}","metadata":"{\"shared\":{\"sf_ver\":\"1-0-40\",\"ck_on\":1,\"flash_ver\":\"0\"}}","reportCreativeGeometry":false,"isDifferentSourceWindow":false,"goog_safeframe_hlt":{}}" scrolling="no" marginwidth="0" marginheight="0" width="300" height="250" data-is-safeframe="true" sandbox="allow-forms allow-popups allow-popups-to-escape-sandbox allow-same-origin allow-scripts allow-top-navigation-by-user-activation" role="region" aria-label="Advertisement" tabindex="0" data-google-container-id="5" style="border: 0px; vertical-align: bottom;">
At the meeting, Singh reviewed the inter-state transmission plans in Rajasthan, Gujarat, Tamil Nadu, Andhra Pradesh, and Maharashtra. Emphasis was laid on completing the projects in a time-bound manner across the country, according to an official statement.
Also Read
NTPC, Reliance, Adani top green hydrogen plays to bet on, say analysts
L&T to build energy infra for world's largest green hydrogen plant at NEOM
We have set a target of 60GW of renewable by 2032: NTPC Green's Bhargava
Adani Green Energy to seek board approval to raise up to $1 billion
To boost production, govt may provide Rs 50/kg support for green hydrogen
Despite decades of power reforms, discoms still an area of darkness
India's trade deficit falls to $20.13 bn in June from $22.1 bn in May
No GST on replacement of parts during warranty period, says council
Civil aviation sector witnessing growth phase: Jyotiraditya Scindia
WPI inflation declines to -4.12% in June on easing prices of food