用户名/邮箱
登录密码
验证码
看不清?换一张
您好,欢迎访问! [ 登录 | 注册 ]
您的位置:首页 - 最新资讯
ACO to install EV fast-charging station at HQ
2021-10-19 00:00:00.0     星报-商业     原网页

       

       PETALING JAYA: ACO Group Bhd is collaborating with EV Connection Sdn Bhd to install a direct-current fast-charging station at ACO Group’s new headquarters in Johor Bahru as part of its initiative to tap into the green technology sector.

       In a statement, it said the electric vehicle (EV) charging station, with a capacity of 180kW, is set to be one of the fastest charging speed stations in Malaysia and the first in Johor.“EV owners will soon be able to drive-in to ACO’s headquarters to charge up their vehicles at up to 180kW which takes up to 30 minutes to charge a car, as compared to alternating current charging points that take about six to 10 hours for a full charge,” it added.

       According to the statement, EV Connection is a leading one-stop electric mobility service provider specialising in EV charging solutions and EV charging stations.

       “Together with EV Connection, we aim to participate in the scaling up of the EV charging network in Malaysia to pave way for greater EV adoption and support the push for driving decarbonisation,” said ACO Group managing director Tan Pee Tee @ Tan Chang Kim.

       “We will leverage on our respective strengths, ACO’s vast product offerings and footprint in Malaysia and EV Connection’s strong technical know-how in EV infrastructure, to accelerate the deployment of EV charging station across Malaysia,” said ACO Group managing director Tan Pee Tee @ Tan Chang Kim.

       


标签:综合
关键词: ACO Group Bhd     Johor Bahru     EV owners     charging     station     180kW     Malaysia    
滚动新闻