A 2017 study recommended that as much as$ 289 million worth of renovations and upgrades were needed to keep parts of the ship from flooding....
The cost options were calculated by Moffatt Nichol, the marine engineering firm hired by the city to evaluate the repairs needed for the ship....
Teams are inspecting the hull, the metal thickness and the fire suppression system on the ship, according to a city report....
综合
洛杉矶时报-商业
2021-07-20 00:00:00.0